Winner of a CRE call for projects, the town hall of Albi has launched a photovoltaic power plant on the ground to meet two major challenges: increase the share of renewable energies in its energy mix and reduce its CO₂ emissions.
Our solution?
The installation of a 5 MWp ground plant, producing 6,600 MWh/year, equivalent to the consumption of 200 households.
Area: 10 hectares
Annual production
solar panels